The AcquaHT module: intake cabinet, six gel chambers, condenser and water tank on one skid, beside a data-centre hall
Concept render · AW-1000
  1. Pre-seed · Hyderabad, India

    Water from the heat AI throws away.

    AI data centres run hot all day, and most of that heat is thrown away. We are building a machine that uses it to pull clean drinking water out of the air.

    Scroll to take the machine apart

  2. 01 · The heat

    Waste heat comes in

    Warm water from the data centre's cooling loop flows to a heat exchanger. Their water and ours never touch, and the servers' own loop is left alone. If anything on our side fails, a bypass keeps their cooling running. Our side gets water at about 50 °C.

  3. 02 · The air

    Outdoor air goes in

    Fans pull outdoor air in through louvres and two filters. A duct under the chambers carries it to each one.

  4. 03 · Catch and release

    A gel soaks up the water

    Each chamber holds trays of a salty gel. For 100 minutes it soaks up moisture from the air, like a sponge. Then the doors close, hot water runs through the tubes, and for 20 minutes the gel lets the water go as vapour. Six chambers take turns, so one is always giving water.

  5. 04 · The condenser

    Vapour turns back into water

    The vapour reaches a condenser, cools down and turns back into drops of water. On a hot Hyderabad afternoon this is the hardest step, so it is the first one we test.

  6. 05 · Clean water

    Filtered and stored

    The water passes a sediment filter, carbon and UV light, then fills a steel tank. We will test every batch against India's drinking-water standard, IS 10500, and for lithium, because the gel holds a lithium salt.

  7. Where we are

    A concept, tested part by part

    The gel comes from published lab work at UT Austin (PNAS, 2023). We did not invent it. Our job is the machine around it. Before we build this module, we run the gel through 1,000 soak-and-release cycles on our own bench rigs. We call that Gate 1.

IIThe problem

AI is getting thirsty.

I grew up in Siddipet, where drinking water came by tanker. Now the fastest-growing buildings in India are data centres, and many of them cool their servers by evaporating water.

Jerra Swamynathan, founder
One 1 MW data hall, every day: about 45,600 litres, or roughly nine 5,000-litre tankers.

45,600 L

of water a day for one 1 MW data hall that cools with towers

PublishedEESI, June 2025 · average 1.9 L per kWh

7+ GW

of data centres in India by 2030, up from 1.8 GW today

PublishedSavills India via Indian Infrastructure, July 2026

3.3×

more water tankers booked in Hyderabad in October 2026 than a year before

PublishedTelangana Today, 15 Oct 2026

The new buildings and the old tankers now want the same water. Meanwhile the buildings throw away heat all day.

IIIOur story

We built a machine. It made water. A customer paid. Then we saw the power bill.

  1. Nov 2023Started in HyderabadFour people, one workshop
  2. First machineA fridge with bigger plansCompressor, copper coil, one fan
  3. Field tests210 L of safe waterWHO and BIS limits met
  4. May 2026First saleA food company bought one
  5. ThenThe power bill280–400 kWh per 1,000 L. Too much.
  6. NowFree heat insteadFrom AI data centres
AcquaHT's first water-from-air machine: a black steel frame with air filters on top, a coil and a compressor inside
Our first machine. Think of a fridge with bigger plans. It is not the gel machine.

210 L

of water made in two field tests in Telangana

Measured

WHO + BIS

drinking-water limits met in lab tests

Measured

May 2026

our first machine sold to a food company

Measured

15

grants, prizes and programmes backed us before any investor did

See who

Read the full story

We built it in a Hyderabad workshop from a compressor, a copper coil and one fan. It worked. The water was safe to drink, and a customer paid for it.

Then we did the maths. A machine that chills air to make water uses 280 to 400 units of electricity for every 1,000 litres. That is a lot of power for a glass of water, and it makes the water cost far more than a tanker.

So we stopped asking how to make water with less electricity, and started asking where free heat was going to waste. The answer was humming away in every AI data centre.

IVThe idea

A gel that drinks from the air, and gives the water back when you warm it.

A salty gel published by UT Austin in 2023 soaks up moisture and lets it go when heated. AI chips turn almost every watt into heat. Put the two together and you get water from heat that was going in the bin anyway.

2 hours 12 cycles a day
Soak · 100 min
gel pulls moisture from air
Release · 20 min
warm it, water leaves as vapour

The catch, said upfront

In the lab the gel let go of its water at 40 °C, but next to a 25 °C condenser. On a hot Hyderabad afternoon a condenser runs at 35 to 45 °C. So we design for heat at 55 to 75 °C.

Needed · 55–75 °C
Air coolingup to 30 °C · too cold
Tower water30–35 °C · too cold
Liquid cooling45–65 °C · top end works, rest needs a boost
20 °C35506580 °C

Sources: Guan et al., PNAS 2023; ASHRAE liquid-cooling classes. The 55–75 °C band is our steam-table estimate, not yet measured.

VThe machine · AW-1000 concept

Six gel chambers on one skid, parked next to the data centre.

It borrows warm water from the site's cooling loop through a heat exchanger and never touches the servers. If it breaks, the data centre does not notice.

Concept render of the AW-1000 skid next to a data hall: an air intake, six glass-fronted gel chambers, a condenser box and a steel water tank
  1. 0Data hall
  2. 1Warm water in
  3. 2Air intake
  4. 3Six gel chambers
  5. 4Condenser
  6. 5Filters, UV, controls
  7. 6Water tank
Concept render, built from the same model as our simulator.
  1. Data hall
  2. Warm water in
  3. Air intake
  4. Six gel chambers
  5. Condenser
  6. Filters, UV, controls
  7. Water tank
Gel
300 kg in six chambers
Design
Cycle
100 min soaking, 20 min releasing
Published
Water, year average
About 800 L a day
Model
May vs August
256 vs 993 L a day
Model
With a heat-pump condenser
About 1,720 L a day, year average
Model
Electricity
Under 50 Wh per litre, measured
Target
Water quality
IS 10500, plus a lithium limit
Target
Footprint
One skid in the service yard
Design

Don't take our word for it. Every model number here comes from our open simulator. It runs the machine through Hyderabad's weather, month by month. Change the heat, the condenser or the amount of gel, and watch the numbers move.

Open the simulator

VIThe economics

What a litre costs. The honest version.

We would rather show you the real numbers now than have you find them later. Cost to make 1,000 litres in Hyderabad. These are model estimates, not measurements.

Our best caseheat hot enough · 40–60 Wh per litre₹800–960
With a booster heat pump220–280 Wh per litre₹2,200–2,700
Private water tankerHyderabad, 2024 price₹200–240
Model: ₹8 per kWh, ₹6.5 crore to build a block, 14% cost of money, 15 years, running 90% of the time, gel at ₹800 per kg replaced every 3 years. Tanker: ₹1,000–1,200 per 5,000 L.

So no, we can't beat a tanker in Hyderabad today. We start with buyers who already pay more than ₹1,000 per 1,000 litres, or who can't buy water legally at all.

Six ways we bring the cost down

01

Hotter heat

Going from 50 °C to 65 °C heat gives about 67% more water from the same gel.

Model
02

A heat-pump condenser

About twice the water over a year, and no summer slump. It costs more electricity and more money up front.

Model
03

No cooling towers

A cooling tower on our condenser would evaporate about as much water as we make. A lot of effort for zero water.

Model
04

Measure the fans first

Fans are the biggest unknown on the power bill. We meter them on the bench rig before we promise anything.

Target
05

Cheap gel

At ₹800 per kg, replaced every 3 years, the gel is a small part of the cost.

Model
06

The right first buyers

Sites with no legal water source, buyers of water credits, drinking water, and expensive-water places like the Gulf.

Target

The question we can't answer yet. Our hand calculation says 40–60 Wh of electricity per litre. Our simulator, which counts the fans at full speed, says 170–260. Only a real test settles it, so the bench rig measures it on every cycle. Our target is under 50.

Check it yourself

VIIThe plan

Prove the gel. Prove one machine. Then copy it.

Each step happens only if the one before it passes. If the gel fails Gate 1, we switch to another sorbent, and we will know in weeks, not years.

  1. DoneFirst machine made safe water and was sold. Gel bench rigs are being built.Done
  2. Gate 1 · month 61,000 gel cycles with under 10% loss, electricity logged on every oneTarget
  3. Gate 2 · month 12Under 50 Wh per litre, measured, and one data centre signed upTarget
  4. Gate 3 · month 181,000 L a day on real data-centre heat, checked by an outside labTarget
  5. 2028First paying data centre · 10,000 L a dayTarget
  6. 2029–30100,000 L a day at each siteTarget

DoneProof gatesScale up

VIIIWho checked our work

People who bet on us before there was much to see.

These are grants, prizes and programmes, not investors. We have raised no equity.

Grants and fellowships

  • Mercatus Center, George Mason University (Emergent Ventures)
  • beVisioneers: The Mercedes-Benz Fellowship
  • IIM Calcutta Innovation Park
  • MeitY Startup Hub

Prizes

  • IIM Shillong
  • Boeing and T-Hub
  • Telangana State Innovation Cell

Programmes

  • ISB AIC, Indian School of Business
  • AIC-IIITH
  • Indian Institute of Management Jammu
  • BITS Pilani
  • Software Technology Parks of India
  • T-Works

Partners

  • International Water Association
  • Bala Vikasa
  • Emergent Ventures grantMercatus Center, George Mason University
  • Mercedes-Benz beVisioneers Fellow2025 · one of 1,000 young innovators worldwide
  • 1st Prize, IIM Shillong International Water ConferenceCash prize and 3 years of incubation
  • UN-Habitat Youth Assembly 2025Asia-Pacific Top 40 youth solutions · Cebu, Philippines
  • MeitY TIDE 2.0 Entrepreneur-in-ResidenceIIM Calcutta Innovation Park
  • ISB AIC Social Impact Accelerator 3.0Incubated
  • Variance Startup AcceleratorResidency, Bengaluru
  • UN Global CompactParticipant since August 2025

Logos belong to their owners. They show programmes we took part in, not endorsement.

IXTeam

Four people who build, test and sell.

We have already built, tested and sold one water machine on very little money. Now we want to do it again with free heat.

Jerra Swamynathan

Jerra Swamynathan

Founder & CEO

Grew up with tanker water in Siddipet. Built BiGeo, a rural delivery-routing company, before this. Mercedes-Benz beVisioneers Fellow 2025.

Vaidhatri Sanugula

Vaidhatri Sanugula

Biotech & research

Microbiology and DNA testing. Her job is to make sure nobody drinks anything they shouldn't.

Sumanth Malyala

Sumanth Malyala

R&D engineer

Builds our machines, then tests them until they stop surprising us.

Nalla Sai Smaran

Nalla Sai Smaran

Co-founder, business development

Computer engineer. Finds the people who need water and signs them up.

Advisors: Prof. Soumyajit Roy (IISER Kolkata) · Vijender Mogili (Bala Vikasa) · RYLT (manufacturing partner).
Hiring with this round: a sorbent chemist and a data-centre cooling advisor. Right now our sorbent expert is a research paper, and it doesn't reply to email.

XWork with us

Every AI data centre could be a water source. Help us prove it.

We are raising a $750K pre-seed round. We are also looking for our first data-centre partner for a paid 6-month pilot, with pass or fail terms we agree on before we start.

InvestorsPre-seed, $750K

Data centresA paid 6-month pilot

ResearchersGel and field data to share